Skip to main content

AS 5100.8:2017 Bridge design, Part 8: Rehabilitation and strengthening of existing bridges

Standards Australia

Version:  First Edition 2017.  (Current)
error_outline
You are currently viewing a preview version of this resource. Sign in or subscribe for full access.
Publication date
31-03-2017
Pages
140
Current status
Current
Supersedes
Draft Designation: DR AS 5100.8:2016
Document Number
5100
Description
Sets out requirements and procedures for the repair or rehabilitation, extension of remaining service life, strengthening to restore capacity due to structural deterioration, strengthening to increase capacity for live load, and changing the function of and widening of existing bridges. First published as AS 5100.8:2017.
Committee

Bridge Design.

BD-090

Australian Industry Group; Australian Steel Institute; Austroads; Bureau of Steel Manufacturers of Australia; Cement and Concrete Association of New Zealand; Cement Concrete&Aggregates Australia-Cement; Concrete Institute of Australia; Consult Australia; Engineers Australia; New Zealand Heavy Engineering Research Association; Rail Industry Safety and Standards Board; Steel Construction New Zealand; Steel Reinforcement Institute of Australia; Sydney Trains.

ISBN
978 1 76035 721 4
Attribution
Standards Australia 2017.
Licence
© All Rights Reserved
NSW
VIC
QLD
NT
WA
ACT
TAS
SA
Sector
Residential
Civil
Commercial
Industrial
AS 5100.8:2017 Bridge design, Part 8: Rehabilitation and strengthening of existing bridges 2017 cover