Skip to main content

Safe Work Method Statement For Demolition Work

SafeWork NSW

Version:  2017.  (Current)
error_outline
You are currently viewing a limited version of this resource. Sign in or subscribe for full access.
Collections
Pages
16
Current status
Current
Description

A safe work method statement (SWMS) must be prepared by the persons conducting businesses or undertakings (PCBUs) for any identified high risk construction work (HRCW) in relation to all construction work, irrespective of the cost of that work.

A PCBU must eliminate or, where it is not reasonably practicable, control the risks associated with ‘construction work’ in line with the ‘hierarchy of controls’. A PCBU must monitor and, where required, review these risk control measures, especially when workplace specific circumstances change. The SWMS documents the risk control measures that will be implemented for any identified HRCW, and is required to be prepared before HRCW starts.

This example SWMS is for general demolition work and has been developed to assist PCBUs to meet their responsibilities, as required by part 6.3, division 2, High risk construction work – safe work method statements required for in the Work Health and Safety Regulation 2011 (WHS Regulation).

PCBUs can use this as a general example, but would need to adapt this to be workplace specific.

Scope

Contents:

Sample Safe Work Method Statement Demolition Work
Recommended Steps For Completing A Safe Work Method Statement
Hierarchy Of Controls
Safe Work Method Statement Compliance (Information, Monitoring And Review)
Safe Work Method Statement Demolition Work Demolition Form

Attribution
NSW Government
Licence
© All Rights Reserved
NSW
Sector
Residential
Commercial
Civil
Industrial
Safe Work Method Statement For Demolition Work 2017 cover