Skip to main content

Search all content

1 - 10 of 40 results
Selecting a Suitable Sustainable Construction Method for Australian High-Rise Building: A Multi-Criteria Analysis 2022 cover

Publisher
Sustainability

Version:  2022.  (Current)
Short Description
This research aims to identify the most suitable sustainable construction method for high-rise building construction in Australia; results show that the off-site construction method and robotic construction technique significantly improve the construction performance of high-rise construction in Australia.
Building permits and other exemptions BP-02 | Amending a building permit 2023 cover

Publisher
Victorian Building Authority

Version:  2023.  (Current)
Short Description
This Practice Note provides guidance for building surveyors for amending a building permit in compliance with the Building Act 1993 and the Building Regulations 2018.
Toolbox Safety Talks: Workplace Drug And Alcohol Strategy 2020 cover

Publisher
SafeWork SA

Version:  2020.  (Current)
Short Description
This training resource is designed to help you deliver short presentations covering a series of work health and safety topics.
Multi-Storey Residential Buildings: Warranty Insurance Exception 2018 cover

Publisher
Victorian Building Authority

Version:  2018  (Current)
Short Description
This practice note explains the exception from Domestic Building Insurance (DBI) requirements that applies to builders of multi-storey residential buildings.
Mechanical Services MS 05. Evaporative coolers: Drainage provisions 2023 cover

Publisher
Victorian Building Authority

Version:  2023.  (Current)
Drainage DR 05: Junctions in gravity discharge sanitary and drainage systems 2023 cover

Publisher
Victorian Building Authority

Version:  2023.  (Current)
Short Description
This Practice Note provides guidance on the use of junction fittings installed in gravity discharge sanitary and drainage systems.
Waterproofing of Wet Areas 2023 cover

Publisher
Victorian Building Authority

Version:  2023.  (Current)
Short Description
To assist the industry preparing for changes coming in on 1 May 2023, reduce the risk of non-compliant installation of waterproofing systems, and provide an understanding of the key changes for waterproofing for NCC 2022.
Technical Solution Sheet 7.08: Mechanical Services Split System Air conditioner (VIC) 2020 cover

Publisher
Victorian Building Authority

Version:  2020.  (Current)
Short Description
Specifies the requirements for the safe discharge of water from a split system air conditioner.
Safety signs in the workplace (SA) 2018 cover

Publisher
SafeWork SA

Version:  2018.  (Current)
Short Description
Safety signs inform and warn you of hazards and risks in the workplace, tell you what to do in an emergency situation and show you how to protect yourself and work safely.
Respirable Crystalline Silica Campaign Report 2020-2021 cover

Publisher
SafeWork SA

Version:  2021.  (Current)
Short Description
From 1 October 2020 to 1 April 2021, SafeWork SA undertook a compliance campaign (the campaign) focused on respirable crystalline silica (RCS) in the fabrication, construction, and mining industries; The fabrication industry included persons conducting a business or undertaking (PCBUs) using engineered and natural stone (i.e. monumental masons).