Skip to main content

Search all content

1 - 10 of 23 results
Book 1 - Guide to Internal Wet Area Waterproofing cover

Publisher
Master Builders Australia

Version:  2017 Revised Edition.  (Current)
Short Description
A guide to internal wet areas waterproofing.
Book 2 - Guide to External Waterproofing - Balcony Decks 2017 cover

Publisher
Master Builders Australia

Version:  2017 Revised Edition.  (Current)
Short Description
A guide to waterproofing of balconies and decks.
Book 3 - Guide to Planter Box Waterproofing 2017 cover

Publisher
Master Builders Australia

Version:  2017 Revised Edition.  (Current)
Short Description
A guide to waterproofing of planter boxes.
Book 4 - Flashings and Damp-Proof Courses 2017 cover

Publisher
Master Builders Australia

Version:  2017 Revised Edition.  (Current)
Short Description
A guide to waterproofing of flashings and damp proof courses.
AS 4254.1:2021 Ductwork for air-handling systems in buildings, Part 1: Flexible duct 2021 cover

Publisher
Standards Australia

Version:  Second Edition 2021.  (Current)
Short Description
Provides standardized requirements for the performance testing, manufacture and installation of flexible ducts.
AS 4254.2-2012 Ductwork for air-handling systems in buildings, Part 2: Rigid duct 2012 cover

Publisher
Standards Australia

Version:  First Edition 2012.  (Pending Revision)
Short Description
Sets out requirements for materials, construction, and installation, including some aspects of performance, for ductwork for air-handling systems in buildings and facilities, including systems designed in accordance with requirements of AS/NZS 1668.1 and AS 1668.2.
AS/NZS 5139:2019 Electrical installations - Safety of battery systems for use with power conversion equipment 2019 cover

Publisher
Standards Australia/Standards New Zealand

Version:  First Edition 2019.  (Current)
Short Description
Specifies requirements for general installation and safety requirements for battery energy storage systems (BESSs), where the battery system is installed in a location, such as a dedicated enclosure or room, and is connected with power conversion equipment (PCE) to supply electric power to other parts of an electrical installation.
AS/NZS 5033:2021 Installation and safety requirements for photovoltaic (PV) arrays 2021 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Fourth Edition 2021.  (Current)
Short Description
Sets out general installation and safety requirements for electrical installations of PV arrays, including d.c. array wiring, electrical protection devices, switching and earthing provisions.
AS/NZS 3000:2018 Electrical installations (known as the Australian/New Zealand Wiring Rules) 2018 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Third Edition 2018.  (Current)
Short Description
AS NZS 3000 2018 (known as the Australian/New Zealand Wiring Rules) specifies requirements for the design, construction and verification of electrical installations, including the selection and installation of electrical equipment forming part of such electrical installations; part 1 provides provisions that constitute the minimum regulatory requirements for a safe electrical installation; part 2 provides work methods and installation practices that are ‘deemed to comply’ with the requirements of Part 1.
AS/NZS 3666.1:2011 Air-handling and water systems of buildings - Microbial control, Part 1: Design, installation and commissioning 2011 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Third Edition 2011.  (Pending Revision)
Short Description
Specifies minimum requirements for the design, installation and commissioning of air-handling and water systems of buildings for the purposes of microbial control. It does not include requirements for refrigerated room airconditioners and non-ducted split systems.