Skip to main content

Search all content

1 - 10 of 23 results
AS 1191-2002 Acoustics - Method for laboratory measurement of airborne sound transmission insulation of building elements 2002 cover

Publisher
Standards Australia

Version:  Third Edition 2002.  (Current)
Short Description
Provides a method for the measurement of airborne sound reduction index to building partitions such as walls, floor/ceiling assemblies, doors, windows and other space dividing elements.
AS/NZS 2107:2016 Acoustics - Recommended design sound levels and reverberation times for building interiors 2016 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Second Edition 2016.  (Current)
Short Description
Recommends design criteria for conditions affecting the acoustic environment within building interiors to ensure a healthy, comfortable and productive environment for the occupants and the users.
Resilient Homes Fund: Building industry fact sheet. Quoting and contracting resilience works (for licensed contractors) 2023 cover

Publisher
Queensland Government

Version:  2023.  (Current)
Short Description
Flood resilient design is one of the many ways Queenslanders can build their resilience to floods.
Resilient Homes Fund Contractor Quote Tool Guidelines 2023 cover

Publisher
Queensland Government

Version:  2023.  (Current)
Short Description
The RHF Contractor Quoting tool was created to provide a standardised method of quoting for Industry Builders participating in the Resilient Homes Fund (RHF). (Includes Contractor Quoting tool download).
rhf-industry-guidance-flood-resilient-home-a3 2022 cover

Publisher
Queensland Government

Version:  2022.  (Current)
Short Description
This Industry Guidance for Flood Resilient Homes provides information about improving the flood resilience of new and existing Queensland homes.
design-guidance-for-flood-resilient-homes 2022 cover

Publisher
Queensland Government

Version:  2022.  (Current)
Short Description
Queensland homeowners who experienced damage to their residential property as a result of flooding in 2021–22 can now register their interest for the $741 million Resilient Homes Fund.
AS/NZS 5139:2019 Electrical installations - Safety of battery systems for use with power conversion equipment 2019 cover

Publisher
Standards Australia/Standards New Zealand

Version:  First Edition 2019.  (Current)
Short Description
Specifies requirements for general installation and safety requirements for battery energy storage systems (BESSs), where the battery system is installed in a location, such as a dedicated enclosure or room, and is connected with power conversion equipment (PCE) to supply electric power to other parts of an electrical installation.
AS/NZS 5033:2021 Installation and safety requirements for photovoltaic (PV) arrays 2021 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Fourth Edition 2021.  (Current)
Short Description
Sets out general installation and safety requirements for electrical installations of PV arrays, including d.c. array wiring, electrical protection devices, switching and earthing provisions.
AS/NZS 3000:2018 Electrical installations (known as the Australian/New Zealand Wiring Rules) 2018 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Third Edition 2018.  (Current)
Short Description
AS NZS 3000 2018 (known as the Australian/New Zealand Wiring Rules) specifies requirements for the design, construction and verification of electrical installations, including the selection and installation of electrical equipment forming part of such electrical installations; part 1 provides provisions that constitute the minimum regulatory requirements for a safe electrical installation; part 2 provides work methods and installation practices that are ‘deemed to comply’ with the requirements of Part 1.
Strata Resilience Program (QLD) 2024 cover

Publisher
Queensland Government

Version:  2024.  (Current)
Short Description
The Strata Resilience Program (the Program) aims to assist eligible bodies corporate in coastal parts of Central and North Queensland to improve the resilience of their properties against cyclones.