Skip to main content

Search all content

11 - 20 of 22 results
AS/NZS 3666.1:2011 Air-handling and water systems of buildings - Microbial control, Part 1: Design, installation and commissioning 2011 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Third Edition 2011.  (Pending Revision)
Short Description
Specifies minimum requirements for the design, installation and commissioning of air-handling and water systems of buildings for the purposes of microbial control. It does not include requirements for refrigerated room airconditioners and non-ducted split systems.
AS 2665-2001 Smoke/heat venting systems - Design, installation and commissioning 2001 cover

Publisher
Standards Australia

Version:  Second Edition 2001.  (Current)
Short Description
Specifies requirements for the design, installation and commissioning of a system of sutomatic smoke/heat release vents in conjunction with associated smoke reservoirs in buildings.
AS 1562.1:2018 Design and installation of metal roof and wall cladding, Part 1: Metal 2018 cover

Publisher
Standards Australia

Version:  Second Edition 2018.  (Current)
Short Description
This Standard sets out requirements for the design and installation of self-supporting metal roof and wall cladding, subjected to out-of-plane external actions and in-plane thermally induced actions, permanent actions on walls and steep roofs and frictional drag of wind and snow actions.
AS 1668.2:2024 The use of ventilation and airconditioning in buildings, Part 2: Mechanical ventilation in buildings 2024 cover

Publisher
Standards Australia

Version:  Third Edition 2024.  (Current)
Short Description
Provides users with minimum design parameters and guidelines for determining ventilation rates for general application in buildings
AS 1668.1:2015 The use of ventilation and air conditioning in buildings, Part 1: Fire and smoke control in buildings 2015 cover

Publisher
Standards Australia

Version:  First Edition 2015.  (Current)
Short Description
Sets out minimum requirements for the design, construction, installation and commissioning of mechanical smoke control systems in buildings; specific methods of smoke control are defined and the appropriate requirements specified for each.
AS 3999:2015 Bulk thermal insulation - Installation 2015 cover

Publisher
Standards Australia

Version:  Second Edition 2015.  (Current)
Short Description
Sets out requirements on installing insulation in both new dwellings during construction and the retrofitting of insulation in existing buildings.
AS/NZS 1562.2:1999 Design and installation of sheet roof and wall cladding, Part 2: Corrugated fibre-reinforced cement 1999 cover

Publisher
Standards Australia/Standards New Zealand

Version:  First Edition 1999.  (Current)
Short Description
Sets out requirements for the materials, design and installation of corrugated fibre-reinforced cement roof and wall cladding; provides test procedures for the determination of resistance to wind force; appendix gives advice on the provision of roof ventilation.
AS/NZS 3500.3:2025 Plumbing and drainage, Part 3: Stormwater drainage 2025 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Fifth Edition 2025.  (Current)
Short Description
AS/NZS 3500.3:2025 specifies the requirements for materials, design, installation and testing of roof drainage systems, surface drainage systems and subsoil drainage systems to a point of connection
AS 4254.1-2012 Ductwork for air-handling systems in buildings, Part 1: Flexible duct 2012 cover

Publisher
Standards Australia

Version:  First Edition 2012.  (Available Superseded)
Short Description
Specifies requirements for materials, construction and installation, including some aspects of performance, for flexible duct for air-handling systems in buildings and facilities.
AS 1668.2-2012 The use of ventilation and airconditioning in buildings, Part 2: Mechanical ventilation in buildings 2012 cover

Publisher
Standards Australia

Version:  Fifth Edition 2012.  (Available Superseded)
Short Description
AS 1668.2 2012 sets out requirements for mechanical air-handling systems that ventilate buildings and car parks, and for ventilation based on the need to control odours, particulates and specific gases. Also known as AS 1668 part 2.