Skip to main content

Search all content

1 - 10 of 33 results
Plumbing and Drainage Act 2011 No 59 (NSW) 2011 cover

Publisher
NSW Government

Version:  2011.  (Current)
Short Description
This Act is the Plumbing and Drainage Act 2011. (NSW legislation.)
Plumbing and Drainage Regulation 2017 (NSW) 2017 cover

Publisher
NSW Government

Version:  2017.  (Current)
Short Description
This Regulation is the Plumbing and Drainage Regulation 2017.(NSW legislation.)
Resilient Homes Fund: Building industry fact sheet. Quoting and contracting resilience works (for licensed contractors) 2023 cover

Publisher
Queensland Government

Version:  2023.  (Current)
Short Description
Flood resilient design is one of the many ways Queenslanders can build their resilience to floods.
Resilient Homes Fund Contractor Quote Tool Guidelines 2023 cover

Publisher
Queensland Government

Version:  2023.  (Current)
Short Description
The RHF Contractor Quoting tool was created to provide a standardised method of quoting for Industry Builders participating in the Resilient Homes Fund (RHF). (Includes Contractor Quoting tool download).
rhf-industry-guidance-flood-resilient-home-a3 2022 cover

Publisher
Queensland Government

Version:  2022.  (Current)
Short Description
This Industry Guidance for Flood Resilient Homes provides information about improving the flood resilience of new and existing Queensland homes.
design-guidance-for-flood-resilient-homes 2022 cover

Publisher
Queensland Government

Version:  2022.  (Current)
Short Description
Queensland homeowners who experienced damage to their residential property as a result of flooding in 2021–22 can now register their interest for the $741 million Resilient Homes Fund.
Plumbing Regulations 2018 (VIC) 2018 cover

Publisher
Victorian Government

Version:  2018.  (Current)
Short Description
Authorised Version incorporating amendments as at 1 February 2024. (VIC legislation.)
AS/NZS 5139:2019 Electrical installations - Safety of battery systems for use with power conversion equipment 2019 cover

Publisher
Standards Australia/Standards New Zealand

Version:  First Edition 2019.  (Current)
Short Description
Specifies requirements for general installation and safety requirements for battery energy storage systems (BESSs), where the battery system is installed in a location, such as a dedicated enclosure or room, and is connected with power conversion equipment (PCE) to supply electric power to other parts of an electrical installation.
AS/NZS 5033:2021 Installation and safety requirements for photovoltaic (PV) arrays 2021 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Fourth Edition 2021.  (Current)
Short Description
Sets out general installation and safety requirements for electrical installations of PV arrays, including d.c. array wiring, electrical protection devices, switching and earthing provisions.
Strata Resilience Program (QLD) 2024 cover

Publisher
Queensland Government

Version:  2024.  (Current)
Short Description
The Strata Resilience Program (the Program) aims to assist eligible bodies corporate in coastal parts of Central and North Queensland to improve the resilience of their properties against cyclones.