Skip to main content

Search all content

1 - 6 of 6 results
AS 1271-2003 Safety valves, other valves, liquid level gauges and other fittings for boilers and unfired pressure vessels 2003 cover

Publisher
Standards Australia

Version:  Fifth Edition 2003.  (Current)
Short Description
Specifies requirements for the design, construction and testing of safety valves, other valves, liquid relief valves, liquid level gauges, blowdown valves and other fittings for use on boilers and unfired pressure vessels and their associated piping.
AS/NZS 4836:2023 Safe working on or near low-voltage and extra-low voltage electrical installations and equipment 2023 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Third Edition 2023.  (Current)
Short Description
Outlines principles, guidelines and procedures for safe work on or near low-voltage and extra-low voltage electrical installations and equipment; provides a minimum set of procedures, safety requirements and recommendations to manage the hazards associated with electricity, specifically arc blast, arc flash, electric shock, and electrocution.
QBCC Small Building Projects Contract 2016 cover

Publisher
Queensland Building And Construction Commission

Version:  2016.  (Current)
Short Description
For Domestic Building Projects Not Exceeding $3,300.
Contract For Demolition Of Residential Premises 2018 cover

Publisher
Queensland Building And Construction Commission

Version:  2018.  (Current)
Short Description
This contract has been developed specifically to assist homeowners and demolition contractors to record their agreement regarding the demolition of a home (e.g. following a natural disaster such as a flood or cyclone).
Security of Payment Guide cover 2021

Publisher
NSW Government

Version:  2021.  (Current)
Short Description
Understanding progress payments in the building and construction industry.
Supporting Statement: Owner Occupier Construction Contracts cover 2021

Publisher
NSW Government

Version:  2021.  (Current)
Short Description
This form should be used by a head contractor who has a construction contract that is an owner occupier construction contract.