Skip to main content

Search all content

1 - 7 of 7 results
Book 1 - Guide to Internal Wet Area Waterproofing cover

Publisher
Master Builders Australia

Version:  2017 Revised Edition.  (Current)
Short Description
A guide to internal wet areas waterproofing.
Book 2 - Guide to External Waterproofing - Balcony Decks 2017 cover

Publisher
Master Builders Australia

Version:  2017 Revised Edition.  (Current)
Short Description
A guide to waterproofing of balconies and decks.
Book 3 - Guide to Planter Box Waterproofing 2017 cover

Publisher
Master Builders Australia

Version:  2017 Revised Edition.  (Current)
Short Description
A guide to waterproofing of planter boxes.
Book 4 - Flashings and Damp-Proof Courses 2017 cover

Publisher
Master Builders Australia

Version:  2017 Revised Edition.  (Current)
Short Description
A guide to waterproofing of flashings and damp proof courses.
An Exploration Of Factors Influencing Quality Management System (Qms) Implementation: The Case Of The Australian Construction Industry 2020 cover

Version:  2020.  (Current)
Short Description
This research primarily aims to investigate an inclusive list of factors impacting on quality management system deployment in the construction industry building sector by focusing exclusively on the external factors and the critical success factors of project level in order to develop a comprehensive framework of quality management system deployment.
SAHT-Construction-Requirements-for-Class-1A-Buildings 2020 cover

Publisher
SA Housing Authority

Version:  2020.  (Current)
Short Description
These requirements are additional to the NATSPEC Simple Domestic specification requirements and if differences in interpretation between the two should arise then these requirements take precedence.
SAHT-Minimum-Design-and-Construction-Specification-for-Class-2-Apartment-Buildings- 2018 cover

Publisher
SA Housing Authority

Version:  2018.  (Current)
Short Description
All proposals shall comply with this Minimum Design and Construction Specification (MDCS) together with any additional requirements issued by the Principal with the tender call and any encumbrances, building envelopes, Building Guidelines and Council requirements to which the proposed land is subject.