Skip to main content

Search all content

1 - 6 of 6 results
AS 1670.1:2024 Fire detection, warning, control and intercom systems - System design, installation and commissioning, Part 1: Fire 2024 cover

Publisher
Standards Australia

Version:  Fifth Edition 2024.  (Current)
Short Description
Sets out requirements for the design, installation and commissioning of fire detection and alarm systems comprising components conforming with the requirements of the appropriate product Standard.
AS/NZS 3500.4:2021 Plumbing and drainage, Part 4: Heated water services 2021 cover

Publisher
Standards Australia/Standards New Zealand

Version:  Fourth Edition 2021.  (Available Superseded)
Short Description
Sets out the requirements for the design, installation and commissioning of heated water services using drinking water or rainwater or a combination thereof; includes aspects of the installation from, and including, the valve(s) on the cold water inlet to any cold water storage tank or water heater and the downstream fixtures and fittings; applies to new installations as well as alterations, additions and repairs to existing installations.
QBCC Small Building Projects Contract 2016 cover

Publisher
Queensland Building And Construction Commission

Version:  2016.  (Current)
Short Description
For Domestic Building Projects Not Exceeding $3,300.
Contract For Demolition Of Residential Premises 2018 cover

Publisher
Queensland Building And Construction Commission

Version:  2018.  (Current)
Short Description
This contract has been developed specifically to assist homeowners and demolition contractors to record their agreement regarding the demolition of a home (e.g. following a natural disaster such as a flood or cyclone).
Security of Payment Guide cover 2021

Publisher
NSW Government

Version:  2021.  (Current)
Short Description
Understanding progress payments in the building and construction industry.
Supporting Statement: Owner Occupier Construction Contracts cover 2021

Publisher
NSW Government

Version:  2021.  (Current)
Short Description
This form should be used by a head contractor who has a construction contract that is an owner occupier construction contract.